

Utility
Heating Ventilation Air Conditioning system, Water system, Compressed air system, Gas system are operating for pharmaceutical production facilities.
Engineering manages routine monitoring, preventaitve maintenace, calibration, validation to comply with GMP condition of product facility.
HVAC system (AHU 25EA)

Water system (7,000 l/hr PW(purified water), 3,000 l/hr WFI(Water for injection), 2,000 kg/hr PS(pure steam))

Compressed air system (Oil-free scroll type, 16.8㎥/hr)
